[. . . ] LaCie 12big Rack Fibre User Manual Table of Contents page 1 Table of Contents 1. System Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LaCie 12big Rack Fibre RAID Enclosure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LaCie 12big Rack Fibre expansion Enclosure. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . [. . . ] Withdraw the enclosure until it reaches the hard stops (approximately 400 mm (15. 75 inches)). Tighten the front rack bracket mounting screws, again, previously left loose. Push the enclosure completely into the rack cabinet and attach to the front of the rack using the captive fasteners on the front flanges (located just outside of the handles). Module Removal & Installation for procedures to install the plug-in modules removed in preparation for the installation, then continue with section 2. 4. 6. 28 - Mounting the Enclosure into a Rack LaCie 12big Rack Fibre User Manual Getting Started page 30 2. 4. Module Removal & Installation The LaCie 12big Rack Fibre and LaCie 12big Rack Fibre expansion enclosure is supplied fully populated with all plug-in modules installed. However, during installation it is strongly recommended to remove the plug-in modules in order to lighten the enclosure while the rail assemblies are installed and the enclosure installed into the rack cabinet. The removal and installation procedures for each plug-in module are provided in this section. 2. 4. 1. Power Supply Module Fig. Push the latch, above the power supply handle, to the right, then grip the handle and pull the module out of the enclosure. Check for damage, especially to the rear connector on the power supply. CAUTION: Handle the module carefully and avoid damaging the connector pins. 30 - Inserting the Power Supply Module LaCie 12big Rack Fibre User Manual Getting Started page 31 2. 4. 2. Cooling Fan Module 2. 4. 2. 1. Withdraw the cooling fan module completely from the enclosure. Fig. 32 - Removing the Cooling Fan Module LaCie 12big Rack Fibre User Manual Getting Started page 32 2. 4. 3. Installing the Cooling Fan Module 1. CAUTION: Handle the module carefully and avoid damaging the connector pins. With the latch in the open position, slide the module into the enclosure until the latch engages. 34 - Inserting the Cooling Fan Module LaCie 12big Rack Fibre User Manual Getting Started page 33 2. 4. 4. RAID Controller Module 2. 4. 4. 1. Using two hands, grasp each latch between your thumb and forefinger of each hand. CAUTION: Handle the module carefully and avoid damaging the connector pins. Pull the latches outward to eject the module out of the enclosure (Fig. Grip the latches as handles and withdraw the RAID Controller module (Fig. 36 - Removing the RAID Controller Module LaCie 12big Rack Fibre User Manual Getting Started page 34 2. 4. 4. 2. [. . . ] Power Supply Safety and EMC Compliance Safety Compliance UL 60950-1 IEC 60950-1 EN 60950-1 EMC Compliance CFR47 Part 15B Class A EN55022 EN55024 7. 5. AC Power Cords IMPORTANT INFO: The plug and the complete power cord assembly must meet the standards appropriate to the country, and must have safety approvals acceptable in that country. United States Cord Type Plug Socket SV or SVT, 18 AWG minimum, 3 conductor - 4. 5 meters maximum length. NEMA 5-15P grounding-type attachment plug rated 120V 10A; or IEC 320 C14, 250V, 10A. IEC 320 C-13, 250V, 10A. Europe and Others Cord Type Socket Harmonized, H05-VVF-3G1. 0. [. . . ]